
Project starts
The project begins with a strong desire to tackle the initially defined objectives:
- Development of an AI platform
- Integration and validation of the AI modules.
- Scenario analysis and definition of means for the Inspection, Maintenance and Repair (IMR) operations of wind farms.
- Design of an eco-SOV vessel for the maintenance of floating wind farms
- Development of a prototype ROTV towed vehicle for underwater inspection.
- Simulation and scale model tests and sea trials for the ROTV.