Skip to content

Project starts

The project begins with a strong desire to tackle the initially defined objectives:

  1. Development of an AI platform
  2. Integration and validation of the AI modules.
  3. Scenario analysis and definition of means for the Inspection, Maintenance and Repair (IMR) operations of wind farms.
  4. Design of an eco-SOV vessel for the maintenance of floating wind farms
  5. Development of a prototype ROTV towed vehicle for underwater inspection.
  6. Simulation and scale model tests and sea trials for the ROTV.