Skip to content

Integrated Digital Platform for the Operation and Maintenance of Floating Wind Farms

Predictive AI-Based Digital Twin

Development of a predictive AI-based digital twin that optimizes the operation and maintenance strategies of the wind farm, aiding the operator’s decision-making and reducing operational expenses (OPEX)

Eco-SOV vessel and towed vehicle (DUDONGO)

New eco-SOV vessel for the maintenance of floating offshore wind farms, featuring a reduced length (around 60 meters) and providing accessibility to the units of a floating wind farm 90% of the time. It incorporates a towed vehicle (DUGONGO), smaller than usual, for the inspection and maintenance of the cable and anchoring system.

Hybrid propulsion system

Hybrid propulsion system based on ECO fuels such as green ammonia (NH3) or green methanol

AI Predictive digital twin

ECO-SOV vessel

Design of an innovative SOV vessel for the maintenance of floating wind turbines with a DP-2 Intelligent positioning system .

Prototype of a towed vehicle for underwater cable inspection – DUGONGO

Incorporation into the eco-SOV vessel of a towed vehicle (DUGONGO) smaller than usual for cable and mooring system inspection and maintenance.

This project, with file number MIP-20221009, has been subsidized by the CDTI – Centro de Desarrollo Tecnológico Industrial through the “Misiones CDTI” program call for the year 2022 and is supported by the Ministry of Science and Innovation.
Budget of the project: 1.741.103€
Budget granted: 1.216.956€
Project execution date: December 1, 2022 – December 31, 2024

e>